Study of the source system and evaluation of the feasibility of a desalination plant on the Tara River
Archimeter carried out topographic surveys on the Tara river on behalf of AQP S.p.A. to conduct a highly specialized study on the qualitative and quantitative status of the source system of the Tara.
Particular attention is paid to the verification of the technical feasibility of a potential desalination plant for the brackish water coming from the source.
Rely on Archimeter's experience and expertise to obtain detailed and accurate information on the condition of the water system.
Project Description
- Location: Tara river, Taranto, Apulia, Italy
- TAG: #topographic survey #aerophotogrammetric survey #desalination plant survey